In addition to building several high-voltage substations, switch stations, and interconnect stations ranging in voltage from 33 kV to 400 kV for both public and private clients, Parot Renewables LLP is adept at executing substation work under the engineer-procure-construct (EPC) mode of project delivery.
• Substation construction, design, and upgrades • GIS, SVC and HVDC installation • Bus welding and steel erection • Installing instruments, SCADA, control panels, metal-clad switches, circuit breakers, and switches • Relocating, assembling, and degasifying power transformers